19th May, 2026
The project included the installation of: ARIS Inflatable Dock Shelter ARBD Wheel Guides ARTR Red/Green LED Traffic Light System ARRS Insulated Electrically Operated Roller Shutter Door The inflatable dock shelter was fully integrated with the roller shutter door and traffic light system, enabling an automatic inflate and deflate operation for improved efficiency and ease of use. Another successful installation was delivered for this valued existing customer, enhancing both loading bay
8th May, 2026
Six Model ARRS electrically operated roller shutter doors were successfully installed at one of Windsor’s most well-known and popular theme parks. The doors were supplied and fitted as part of a newly constructed security baggage check facility, helping to support the park’s enhanced visitor security operations. The project was completed on time and within budget, delivering a high-quality solution that met all client requirements. Armo have been manufacturing high quality loading
28th April, 2026
Armo has successfully completed a project in Widnes, replacing seven existing retractable frame dock shelters with advanced Model ARIS fully insulated inflatable dock shelters. These new systems were seamlessly integrated into the existing door controls, enabling automatic activation for improved efficiency and ease of use. With a strong focus on reducing energy loss at the loading bay openings, our client turned to Armo for expert guidance and a reliable, high-performance solution. The result
20th April, 2026
The existing large access roller shutter was removed to enable a full structural upgrade. New steelwork was installed to create two purpose-built openings: one dedicated access doorway and a second transformed into a fully functional loading bay.A high-performance electro-hydraulic dock leveller was installed within a robust support frame, complete with a rear access ramp to ensure the leveller operates at the optimal height for the client’s trailer fleet.The project was delivered on time
13th April, 2026
An existing large ground-level access door has been successfully transformed into a fully functional modular dock loading bay solution for our client in Skelmersdale. The client required a safe and efficient way to unload sea containers, and turned to Armo to deliver a tailored solution designed around their operational needs. Following a site assessment, we proposed and installed the following equipment: • Model ARMD – 6000mm (W) x 6000mm (L) modular dock complete with safety gu
1st April, 2026
We’re proud to announce the successful mechanical installation of two high-performance loading bays for our valued client in Royston, Hertfordshire. Designed for efficiency, durability, and safety, this installation enhances the site’s loading capabilities and supports demanding operational needs. Project Highlights: Installation of 2 x telescopic lip dock levellers 2000mm wide x 3000mm long units for optimal loading parameters 10,000KG single axle load capacity, built for heav
20th March, 2026
We’re pleased to have successfully delivered another project in Warrington, supplying and installing: • 2 Loading Bays • 3 Level Access Insulated Doors The project was completed on schedule and on budget A big thank you to everyone involved in delivering another smooth and efficient installation. If you’re planning a project involving loading bays, industrial doors, or warehouse access solutions, feel free to get in touch.
27th February, 2026
Our Italian manufacturing plant, Armo S.p.A., has been producing high-quality lifting tables in Turin, northern Italy, since 1972. Our comprehensive lifting table portfolio features static scissor lift tables designed for a wide range of applications, including: Goods Lifts – Ideal for transferring products between levels with short vertical travel. Mezzanine Lifts – Designed for moving goods between floors where longer vertical travel is required. Vehicle Loading Lifts – E
13th February, 2026
Our client in Nottingham wanted to seal trailers off-centre of a level access opening Armo supplied, delivered, and installed a level access dock shelter, steel support frame and infill cladding to close off on the right-hand side of the door opening
6th February, 2026
Our client in Mansfield required the conversion of an existing level-access opening into a fully functional loading bay to enable the safe handballing of products from containers. In response, Armo developed a tailored solution, resulting in the following scope of works being approved and installed: ARRS insulated roller shutter door to replace the existing door ARLH insulated loadhouse structure incorporating a telescopic lip dock leveller and associated buffers ARMD internal modular d