16th November, 2026
The installation involved upgrading the existing dock ramp with a range of loading bay equipment, including: Model ARTL Telescopic Lip Dock Leveller Model ARDB Loading Dock Buffers Model ARTL LED Traffic Lights and Gates, with an interlocking system linked to the gate loc Model ARBD Wheel Alignment Guides The new equipment provides a controlled and efficient loading environment, combining vehicle guidance, dock protection and integrated traffic light and gate operation to support safer
15th October, 2026
Armo UK has recently completed a loading bay upgrade project in Sleaford, delivering 2no. new telescopic load houses and associated loading bay equipment.The project included the installation of:· 2no. Model ARLH Telescopic Lip Load Houses· 2no. Model AROD Vertical Lift Overhead Sectional Doors· 2no. Model ARIS Inflatable Dock Shelters· 2no. Model ARTL Traffic Lights· 2no. pairs of Wheel Alignment GuidesThis installation enhances vehicle positioning, loading ba
2nd October, 2026
Armo UK has recently completed a loading bay upgrade project at a customer site in Launceston. The works included the installation of: Installation of 2no. Model ARIS Inflatable Dock Shelters, mounted at 5200mm from yard level Installation of Model ARBD Wheel Alignment Guides Fabrication and installation of goal post frames, welded to the existing loading bay steel structure Installation of head and side infill flashing Credits to the Armo UK installation team for another successful pr
14th September, 2026
We’ve recently completed the removal and disposal of 4 existing roller shutter doors, followed by the successful installation of 4no. Model ARRS Roller Shutter Doors.Specification:- GFA motors with TS959 control panels- Traditional 75mm deep scrolled interlocking lath- Galvanised ‘T’ section bottom rails-
21st August, 2026
We’ve recently completed the installation of a new: - ARMO ARRS Roller Shutter Door - ARSL Swing Lip Dock Leveller with Support Frame - ARDB Loading Dock Buffers - ARBD Wheel Alignment Guides The works included:• The removal and disposal of the existing roller shutter• Installation and central positioning of the new, wider shutter to the existing blockwork• Interlocking the roller shutter and dock leveller for safe operation • Insta
14th August, 2026
This project featured a complete loading bay solution, including: Model ARLH Load House - Frame manufactured from hot rolled steelwork Model ARTL Telescopic Lip Dock Leveller - Treated with an industrially proven paint system incorporating rust inhibitors. Model AROD Insulated Sectional Overhead Door - GFA operator with low level IP65 rated controls. Model ARIS Inflatable Dock Shelter - Heavy duty inflatable dock shelter suitable for accommodating vehicles of varyin
23rd July, 2026
The upgrade included 8 new retractable dock shelters, hot-dip galvanised wheel alignment guides and heavy-duty rubber dock buffers delivering more durable, safer and better-protected loading bays for our client. Whether you're replacing ageing dock equipment or planning a complete loading bay refurbishment, we can provide the right solution for your facility. Contact us to find out more.
5th June, 2026
Our West London project is now well underway, with the first of four Model ARLH load-house structures completed This insulated load-house structure incorporates a rear angled section positioned at 55 degrees, providing an effective solution for the site’s restricted vehicular access space Installed beneath a large canopy, the structure is equipped with: • Model ARTL dock levellers featuring a 1000mm lip extension • Model ARDB dock buffers • Model ARBD wheel alignment gu
19th May, 2026
The project included the installation of: ARIS Inflatable Dock Shelter ARBD Wheel Guides ARTR Red/Green LED Traffic Light System ARRS Insulated Electrically Operated Roller Shutter Door The inflatable dock shelter was fully integrated with the roller shutter door and traffic light system, enabling an automatic inflate and deflate operation for improved efficiency and ease of use. Another successful installation was delivered for this valued existing customer, enhancing both loading bay
8th May, 2026
Six Model ARRS electrically operated roller shutter doors were successfully installed at one of Windsor’s most well-known and popular theme parks. The doors were supplied and fitted as part of a newly constructed security baggage check facility, helping to support the park’s enhanced visitor security operations. The project was completed on time and within budget, delivering a high-quality solution that met all client requirements. Armo have been manufacturing high quality loading