2nd August, 2019
Our client is Europe’s main importers of fruit and are leading the global market in organic and fair-trade fruit. They have been trading with growers all over the world for over 50 years are looking to do so for another 50 years. We have created a new loading bay in an existing building, this was achieved in two phases. Firstly, we created an opening and installed AROD Insulated Sectional Overhead Door. Then we ensured all the cladding, barriers and brickwork are made good. Secondly,
17th June, 2019
Following the successful upgrade of the loading bays in a leading supermarket. We are pleased to be working with them again on the upgrade of their industrial doors....
23rd May, 2019
Armo are once again working with one of the best Midlands contractors, providing complete design, management and build for commercial and residential property development projects. We are pleased to be working with them on another project for a new development in Stoke on Trent. We have installed 5 new complete loading bays, including ARSR Retractable Dock Shelters, ARSL Swing Lip Dock levellers and LED Traffic Lights. Details below of the products we installed. Armo Swing Lip Dock Leveller Mo
22nd May, 2019
We are delighted to be working with one of the world’s leading provider of cold storage and logistics services to the food industry. The facility we are working on is a purpose-built 35-acre site and offers 197,000 pallet spaces of multi-temperature storage. Established in 1941, they are now classed as a world leader in their field. On this occasion, we have installed a high-speed door with motion active radar on either side of the door and complete with crash system, should anyone inadve
16th May, 2019
Our client is one of the UK’s leading independent meat product specialists and has won several awards. We are please to be working with them on this project. Following a site survey by on or our experienced Project Manager. Armo UK have Manufactured and installed the following: ARVL Armo Vehicle Loading Lift Safety is paramount to Armo and all Lift are fully compliant with BS EN 1570 and incorporate the following safety features. Peripheral safe edge with reset feature Chainmesh gua
29th April, 2019
Armo have really enjoyed working closely with the main contractor on another phase of this development. To work with such a conscientious and professional contractor on such a large project has been a pleasure. Armo UK have designed, Installed and manufactured the following: Armo Swing Lip Dock Leveller Model ARSL Armo dock levellers are robust in design and construction; the platforms are made from 6/8 mm tear plate steel, supported by a minimum of 8 longitudinal beams to strengthen the deck
17th April, 2019
Armo UK are proud to be working with the UK’s largest bakery and to be upgrading their loading bays in Enfield to accept double deck trailers. With the advent of double deck trailer more and more companies are upgrading their loading bays to accept double deck trailers. With Armo’s highly experienced team, design and manufacture capability Armo UK can provide you with best solution at the most cost-effective price. On this occasion we have installed the following to achieve a double
9th April, 2019
We have installed a manufactured a Goods Lift in to a English Food Retail Chain with over 240 stores, including their own food brands. Following a site survey our highly experienced Project Manager recommended the best loading and off-loading method for one of their loading bays. This was concluded to be an Armo 1000kg Goods Lift, with a raising speed of 30 seconds and a lowering speed of 15 Seconds. The Goods Lift came complete with high fully sheeted guarding to both sides and with fully she
1st April, 2019
Our valued customer manufacturing facility runs 24 hours a day and seven days a week, our fast turnaround is imperative to keep their production flowing. On this occasion we have manufactured an installed a scissor lift, this has many benefits and can even transport goods from the dock down to yard level. Armo lifting tables are simple and robust in design and construction, from the rolled steel angle base frame through to the solid steel plate arms right through to the structured platform, the
6th March, 2019
Armo (UK) have replaced a Sectional Overhead Doors for a highly reputable refurbishment contractor. They have over 150 years’ experience in the building industry and are a pleasure to work with. Armo (UK) are delighted to be working with them on so many of their projects. On this Job we removed existing concertina door and replaced it with Armo Insulated Sectional Overhead Door, finished in Red RAL 3000. This created not only a more energy efficient property, but also providing a more vis